FY2026 Adopted Town Budgets ÷ 7,983.55 Official NYSDOT Town Road Miles & Census Populations.
Oyster Bay and North Hempstead sit together near $1,810 per town road mile. Oyster Bay's line is a bundled snow contract. North Hempstead's is a salt-and-sand account. The rank below keeps that difference on the card.
Island-wide snow salt / materials
$1,168 / road mile
$9,326,900 across 7,983.55 town miles · $1,168.26 unrounded
Pure salt / materials, 8 towns
$962 / road mile
$4,946,000 across 5,142.51 miles · $961.79 unrounded · led by North Hempstead at $1,809.63
Per-taxpayer cost
$4.10 / TOV resident
$3.24 town-wide · Islip $2.85 to Southampton $9.61
All-in snow removal, 5142
$2,844 / road mile
$21,465,193 on 7,546.88 miles · $2,844.25 unrounded · Hempstead leads at $4,501.03
Ranked by cost per mile
#1
Oyster Bay
NASSAU Bundled snow contractual
$1,810.27per road mile
Salt / materials
$1,308,900 Snow Removal (acct 48900) — salt not separately published
DB.5142.41980 (SALT) + DB.5142.41981 (SAND) · print p. 196 / PDF p. 331
Nassau, Suffolk, and the village effect
The same adopted dollar buys a very different mile in a town full of incorporated villages than in a town that plows nearly every local road itself.
Nassau · 3 towns
$3,808,900
materials across 2,177.11 town miles
$1,749.52 per road mile
All-in 5142: $8,489,302 · $3,899.34 per mile
Suffolk · 10 towns
$5,518,000
materials across 5,806.44 town miles
$950.32 per road mile
Suffolk books more salt dollars on more than twice the town mileage.
North Hempstead · 276.30 town miles
Incorporated villages inside North Hempstead salt their own village streets. The town's CHIPS centerline is 276.30 miles (613.94 lane miles). The highway narrative in the adopted book says more than 280 miles, against the CHIPS figure of 276.30.
Salt and sand: $500,000 · $1,809.63 per mile · $4.98 per TOV resident. Water-district softener salt of $42,000 (code 483) and Port Washington Parking sand/salt of $1,500 stay out of this highway figure.
Brookhaven · 1,816.13 town miles
Brookhaven maintains 1,816.13 town centerline miles, the most of the 13, and more than Hempstead and North Hempstead combined (1,454.07). Its $1,400,000 explicit salt line is the second-largest materials budget and still $770.87 per mile.
Per TOV resident the same line is $3.05, near the bottom of the island, because 459,025 people live outside Brookhaven's villages.
Town centerline miles
Bar length is NYSDOT 2024 town centerline miles. Gold is Nassau. Blue is Suffolk. Village roads, county roads, and state roads are not in these miles.
Brookhaven SuffolkMost town road on the island. More than Hempstead and North Hempstead combined (1,454.07 mi).
1,816.13 mi
Hempstead Nassau
1,177.77 mi
Islip Suffolk
999.90 mi
Huntington Suffolk
808.03 mi
Oyster Bay Nassau
723.04 mi
Babylon Suffolk
529.77 mi
Smithtown Suffolk
469.93 mi
Southampton Suffolk
436.67 mi
East Hampton Suffolk
285.97 mi
North Hempstead NassauIncorporated villages salt their own streets, so the town centerline stays short.
276.30 mi
Riverhead Suffolk
209.01 mi
Southold Suffolk
201.45 mi
Shelter Island Suffolk
49.58 mi
Why dollars per resident flip on the East End
A small year-round Census population is funding hundreds of miles of coastal town road. Ranked per town-outside-village resident, the East End rises and the big western towns fall.
East End per TOV resident
Southampton 59,333 residents outside villages
$9.61
Shelter Island 3,315 residents outside villages
$9.35
Southold 21,670 residents outside villages
$9.09
East Hampton 26,482 residents outside villages
$7.36
Riverhead 36,394 residents outside villages
$6.18
Western towns per TOV resident
Hempstead 516,177 residents outside villages
$3.87
Babylon 170,428 residents outside villages
$3.81
Brookhaven 459,025 residents outside villages
$3.05
Islip 333,640 residents outside villages
$2.85
Islip is the low end at $2.85 per TOV resident (2.8474 unrounded) on 999.90 miles. Southampton is the high end at $9.61 (9.6068) on 436.67 miles and 59,333 TOV residents. Shelter Island is $9.35 on 3,315 TOV residents. Southold is $9.09. East Hampton is $7.36. Hempstead is $3.87. Babylon is $3.81. Brookhaven is $3.05.
Where the winter dollar goes
Salt is one slice of the snow department. In the towns that itemize 5142, overtime and hired plows are often the larger lines. Bar length is the town's all-in snow total compared with Hempstead ($5,301,174). Colors are the share inside that town. Bundled contractual lines stay in the salt/materials color because the book does not split salt from hired plows.
Full time labor $200,000Part time labor $10,000Overtime $600,000Equipment $25,000Program operations $650,000
Smithtown Suffolk · $1,025,194 all-in
OVERTIME SALARY $115,194SAND/ SALT $500,000PATCHING $85,000DISPOSAL STREET SWEEPINGS $175,000EQUIPMENT RENTAL $150,000
Southold Suffolk · $387,000 all-in
PERSONAL SERVICES $170,000EQUIPMENT $20,000CONTRACTUAL EXPENSE $197,000
Riverhead Suffolk · $300,000 all-in
Snow - Personal Services OT $75,000Snow - Contractual $225,000
Shelter Island Suffolk · $47,000 all-in
PERSONAL SERVICES $16,000SALT & SAND, ETC. $31,000
Islip books $900,000 salt and $50,000 sand against $925,000 snow overtime and $1,150,000 equipment rental. Huntington books $800,000 snow-removal materials, $1,330,000 in regular and overtime salaries, $750,000 in motor-vehicle rentals, and $101,745 in Social Security. Brookhaven publishes department totals rather than this split: DA5142 $321,459 and DB5142 $3,098,115, with the $1,400,000 snow-and-ice materials line inside the DB total. East Hampton's 5142 total is $305,378, including $195,000 snow-removal supplies, without a further split. Southampton has no 5142 department.
January 1, 2027, mid-winter budget watch
New York towns budget on a calendar year. The FY2026 adopted books govern November and December 2026. FY2027 books govern January through March 2027, the rest of this winter. Three towns have a verified tentative or preliminary shift on the materials line. Per-mile figures divide those tentative dollars by the same 2024 CHIPS town miles.
Hempstead
+25%
The Highway #4 snow contractual line moves from $2,000,000 to $2,500,000. Per mile that is $1,698.12 to $2,122.66 (about $1,698 to $2,123). All-in Highway #4 moves from $5,301,174 to about $5.72 million.
FY2026 adopted
$2,000,000$1,698.12/mi
FY2027 tentative
$2,500,000$2,122.66/mi
F041 / Dept 51400 / 641940 · Adopted p. 107
North Hempstead
+30%
Sand, salt, etc. moves from $500,000 to $650,000. Per mile that is $1,809.63 to $2,352.52 (about $1,810 to $2,353) on 276.30 town miles.
FY2026 adopted
$500,000$1,809.63/mi
FY2027 tentative
$650,000$2,352.52/mi
DA.07.5142.4690 · lines 3258-3264
Smithtown
+60%
The 2027 tentative sand/salt line is $800,000, 60% above the FY2026 adopted start of $500,000. Per mile that is $1,063.99 to $1,702.38 (about $1,064 to $1,702). During 2026 the line was adjusted to $1,091,372. The 60% figure is measured from the adopted start of $500,000, the figure in the ranking above.
FY2026 adopted
$500,000$1,063.99/mi
FY2027 tentative
$800,000$1,702.38/mi
DS.5142.0401 · print p. 85 / PDF p. 103
All 13 towns
Click a column to sort. Dollars per resident in small type are the unrounded rates. A dash means the adopted book has no 5142 snow department.
3
Hempstead
Nassau
Bundled snow contractual
$2,000,000
1,177.77
2,356.69
$1,698.12
$3.87 3.8746
$2.51 2.5134
$5,301,174
$4,501.03
795,734
516,177
F041 / Dept 51400 / 641940 · Adopted p. 107
2
North Hempstead
Nassau
Explicit salt / sand
$500,000
276.30
613.94
$1,809.63
$4.98 4.9762
$2.09 2.0922
$1,170,000
$4,234.53
238,982
100,478
DA.07.5142.4690 · lines 3258-3264
1
Oyster Bay
Nassau
Bundled snow contractual
$1,308,900
723.04
1,468.89
$1,810.27
$5.41 5.4086
$4.35 4.3468
$2,018,128
$2,791.17
301,115
242,004
DB 5142 / 48900 · Adopted p. 103
5
Babylon
Suffolk
Bundled snow contractual
$650,000
529.77
1,066.64
$1,226.95
$3.81 3.8139
$2.96 2.9577
$1,485,000
$2,803.10
219,766
170,428
DB 5142 / 47 · Adopted p. 50
11
Brookhaven
Suffolk
Explicit salt / sand
$1,400,000
1,816.13
3,614.66
$770.87
$3.05 3.0499
$2.82 2.8202
$3,419,574
$1,882.89
496,410
459,025
DB5142 / 4189
12
East Hampton
Suffolk
Snow supplies / materials
$195,000
285.97
570.20
$681.89
$7.36 7.3635
$6.63 6.6327
$305,378
$1,067.87
29,400
26,482
DB 5142.54750
8
Huntington
Suffolk
Snow supplies / materials
$800,000
808.03
1,615.26
$990.06
$4.15 4.1475
$3.89 3.8856
$2,981,745
$3,690.14
205,891
192,885
DB5142.4350 · print p. 350 / PDF p. 358
10
Islip
Suffolk
Explicit salt / sand
$950,000
999.90
2,006.60
$950.10
$2.85 2.8474
$2.79 2.7870
$3,025,000
$3,025.30
340,867
333,640
DB.5142.41980 (SALT) + DB.5142.41981 (SAND) · print p. 196 / PDF p. 331
6
Riverhead
Suffolk
Bundled snow contractual
$225,000
209.01
419.21
$1,076.50
$6.18 6.1823
$6.18 6.1823
$300,000
$1,435.34
36,394
36,394
DA1-5-5142-400-000-00000
13
Shelter Island
Suffolk
Explicit salt / sand
$31,000
49.58
99.16
$625.25
$9.35 9.3514
$9.25 9.2510
$47,000
$947.96
3,351
3,315
DA5142.447
7
Smithtown
Suffolk
Explicit salt / sand
$500,000
469.93
939.31
$1,063.99
$4.47 4.4657
$4.28 4.2791
$1,025,194
$2,181.59
116,847
111,964
DS.5142.0401 · print p. 85 / PDF p. 103
4
Southampton
Suffolk
Explicit salt / sand
$570,000
436.67
871.61
$1,305.33
$9.61 9.6068
$7.96 7.9608
—
—
71,601
59,333
5110.6446 Sand + 5110.6447 Salt + 5110.6448 Chemicals · Adopted p. 83
9
Southold
Suffolk
Bundled snow contractual
$197,000
201.45
402.09
$977.91
$9.09 9.0909
$8.12 8.1204
$387,000
$1,921.07
24,260
21,670
DB5142.4 · Adopted p. 20
Methodology and primary sources
Every figure in the ranking is an FY2026 adopted appropriation, not a paid invoice. The materials number is the most specific snow-materials line each town prints. Six towns name salt or sand. Two print a snow-removal supplies or materials line. Five print one contractual snow line that covers salt and hired plows together. Those five ranks are the cost of that whole line per mile.
Road miles are NYSDOT CHIPS formula inputs for the 2024 calendar year: town centerline miles, which leave out state, county, and village roads. The 13 towns sum to 7,983.55 centerline miles and 16,044.26 lane miles. Population is the Census Bureau Vintage 2025 estimate for July 1, 2025: 2,880,618 town-wide and 2,273,795 outside villages. Town-wide includes people who live in villages. The per-resident cards show both. Cities are outside the 13-town totals.
Island-wide materials are $9,326,900, or $1,168.26 per town mile (shown as $1,168). The eight towns with a salt, sand, or snow-materials line, leaving out the five bundled contracts, sum to $4,946,000 across 5,142.51 miles, $961.79 per mile (shown as $962), led by North Hempstead at $1,809.63. The six explicit salt/sand towns alone sum to $3,951,000. All-in 5142 for the 12 towns that have the department is $21,465,193. Across their 7,546.88 miles, excluding Southampton, that is $2,844.25 per mile (shown as $2,844). Per resident the materials total is $4.10 outside villages and $3.24 town-wide.
Left out on purpose: Islip's MacArthur Airport runway de-icing line, CT.5610.41840 sand, salt, and chemicals, $37,880. North Hempstead water-district softener salt, $42,000 (code 483), and Port Washington Parking sand/salt, $1,500. Huntington's separate buildings-and-grounds snow materials are facility snow, not town-road salt. Oyster Bay's Highway 5110 sand, stone, and gravel line is $1,000 of construction aggregate.
City of Glen Cove, not in the 13-town totals: 2026 adopted general supplies under A5142 of $75,000 and total snow removal of $150,000. The City of Long Beach proposed book does not show a 5142 or salt line in its text layer.
Smithtown's adopted starting sand/salt appropriation is $500,000. A mid-year 2026 adjusted figure of $1,091,372 appears in the 2027 tentative comparison columns and is not the adopted starting line used in the rank.
Account codes and pages: Hempstead F041 / Dept 51400 / 641940 · Adopted p. 107; North Hempstead DA.07.5142.4690 · lines 3258-3264; Oyster Bay DB 5142 / 48900 · Adopted p. 103; Babylon DB 5142 / 47 · Adopted p. 50; Brookhaven DB5142 / 4189; East Hampton DB 5142.54750; Huntington DB5142.4350 · print p. 350 / PDF p. 358; Islip DB.5142.41980 (SALT) + DB.5142.41981 (SAND) · print p. 196 / PDF p. 331; Riverhead DA1-5-5142-400-000-00000; Shelter Island DA5142.447; Smithtown DS.5142.0401 · print p. 85 / PDF p. 103; Southampton 5110.6446 Sand + 5110.6447 Salt + 5110.6448 Chemicals · Adopted p. 83; Southold DB5142.4 · Adopted p. 20